Bag yield varies by brand, bag weight and mix design, so enter the figure printed on your bag's packaging for the most accurate result — a 20kg general-purpose bag typically yields around 0.01 m³ (about 0.6 ft³ for an 80lb bag) as a rough starting point if you don't have that figure handy. For larger pours, ready-mix delivered by the cubic metre or cubic yard is usually more cost-effective than bags.
Frequently asked questions
How thick should a concrete slab be?
A typical residential path or shed slab is around 100mm (4in) thick; driveways for vehicles are usually thicker, often 125–150mm — check local building requirements, since load and ground conditions affect the right thickness for your project.
How much wastage allowance should I add?
Around 10% is a common default, covering uneven ground, spillage and mixing inaccuracy. Add more for irregularly shaped pours or if you're less experienced with concrete work, since running short mid-pour is a bigger problem than a small excess.
When is it cheaper to order ready-mix instead of bags?
As a rough guide, pours over roughly 1 cubic metre are often more cost-effective as delivered ready-mix rather than dozens of bags — but check quotes locally, since ready-mix minimum order sizes and delivery fees vary a lot by supplier and location.